GO/NOGO Single/Dual/Quad Op-Amp Tester with Offset Measurement CapabilityAfter having inester with Offset Measurement Capability
After having inherited a big batch of new old stock single, dual and quad op-amps of unknown condition, I was faced with the task of testing this batch before pressing the op-amps in to service. So I cobbled together the test circuit given in the enclosed schematic. The test circuit has been designed to handle single, dual and quad op-amps in DIL packages. A green LED indicates that the op-amp section is OK. A simple cheap DMM connected to one of the outputs 1 to 4 indicates the offset voltage produced by the connected op-amp section whereby the reading needs to be divided by 100, i.e. 1V on the DMM corresponds to an offset voltage of 10 mV, 0.1 = 1 mV and so on. With an offset over 10 mV, the green LED turns off. 5 V power supply op-amps can be accommodated by adding the orange coloured circuit section and switching to 5 V operation. However, this 5 V mode is currently untested (lack of such op-amps in my junk box).
Build This Project
Bring this design to life with the Elektor PCB Service, powered by Eurocircuits. Upload the project files and order professionally manufactured PCBs or assembled boards through a proven European production platform.
Supporting KiCad, Eagle, Gerber, and ODB++ formats, the service is suitable for everything from prototypes and validation builds to series production and volume manufacturing.
Made in Europe. Fast. Reliable. Professional.

Discussion (2 commentaire(s))